Practical guides for engineers and buyers specifying pipe supports — the same sizing logic our engineering team applies to your hanger schedules. Use them to write cleaner RFQs, or skip the reading and send us your support schedule — we do the selection for you.

TECH NOTE 01

MSS SP-58 Hanger Types, Explained

What the standard covers, the commonly specified component types, and the A–G spring hanger installation arrangements.

READ THE GUIDE →
TECH NOTE 02

Variable vs Constant Spring Hangers

How each type carries load through travel, the 25% variability rule, and which one your line actually needs.

READ THE GUIDE →
TECH NOTE 03

Spring Hanger Selection Guide

Step-by-step sizing method with a worked example — from hot load and travel to spring rate, size and cold load.

READ THE GUIDE →
TECH NOTE 04

Spring Hanger Installation Guide

Travel stops, hydrotest sequence, preload release and hot position checks — the field procedure end to end.

READ THE GUIDE →
TECH NOTE 05

Pipe Support Spacing Table

Suggested maximum spans for CS pipe in water and steam service — ASME B31.1 practice, in feet and meters.

READ THE GUIDE →
TECH NOTE 06

How to Read a Hanger Schedule

Every column decoded, one worked example row, and the unit traps that cause wrong deliveries.

READ THE GUIDE →
TECH NOTE 07

What to Send for a Quotation

The minimum data per support type, the formats that work, and the three missing fields that stall most enquiries.

READ THE GUIDE →
TECH NOTE 08

Coatings & Finishes for Pipe Supports

Primer, epoxy, HDG or bare stainless — and the zinc rule that governs supports touching stainless and alloy pipe.

READ THE GUIDE →
TECH NOTE 09

How to Specify a Variable Spring Hanger

The load, travel, installation and connection data needed to prepare a clear spring hanger enquiry.

READ THE GUIDE →
TECH NOTE 10

Pipe Shoe vs Guide vs Anchor

How the three support functions differ and which project details should accompany an enquiry.

READ THE GUIDE →
Rows of finished pipe clamps tagged and staged before packing
TECH NOTE 11

Clevis Hanger vs Pipe Clamp

A technical comparison of component interfaces, drawing clues, insulation inputs and two-bolt, three-bolt and riser patterns.

READ THE GUIDE →
Beam clamp and eye nut interface chain used for RFQ review
TECH NOTE 12

Beam Clamp & Eye Nut RFQ Checklist

Confirm drawings, structural and mating interfaces, quantity basis and open TBC items before comparing quotations.

READ THE GUIDE →
Workshop context for reconciling pipe support submittal records
TECH NOTE 13

Pipe Support Submittal Package Checklist

Align support tags, drawing revisions, BOM lines, quantity basis and loose items before supplier review.

READ THE GUIDE →
Wooden crates staged inside a workshop
TECH NOTE 14

Crate, Packing List & Tag Reconciliation

Match package marks, packing-list lines, quantities and pipe-support tags while keeping unresolved fields visible as TBC.

READ THE GUIDE →
Factory testing area used as context for pipe support manufacturing verification
TECH NOTE 15

Pipe Support Manufacturing: What Buyers Should Verify

Connect registered cutting, forming, welding and inspection processes to the drawing, order plan and required release evidence.

READ THE GUIDE →
Rendering of grouped base-mounted constant support units
TECH NOTE 16

Constant Support RFQ Checklist

Control load, travel, direction, arrangement, interfaces, drawings and open TBC items for every support tag.

READ THE GUIDE →

Prefer us to do the sizing?

Send your hanger schedule or stress isometric — data sheet per tag, quotation within 24 hours on working days.

Send Your Schedule
WhatsApp Inquiry